Skip to content

Service · Chicago, Illinois

Asbestos Siding Removal in Chicago

Asbestos siding removal covers cement asbestos shingles and related exterior cladding, often discovered beneath later vinyl or aluminum siding on Chicago frame houses.

  • Professional asbestos assessment
  • Regulated abatement procedures
  • Written project scopes
  • Residential & commercial services

Asbestos siding removal covers cement asbestos shingles and related exterior cladding, often discovered beneath later vinyl or aluminum siding on Chicago frame houses.

The material is non-friable while intact, but breaking or cutting it releases fibers, so exterior removal emphasizes careful handling, weather protection and controlled debris management.

Call Now · (872) 390-0587

Request asbestos siding removal

Your details are used only to respond to this request. By submitting you agree to our privacy policy.

Warning signs

Six reasons to request an assessment

01

Rectangular shingles with a wood-grain texture under later siding.

02

Brittle exterior cladding that snaps rather than bends.

03

Original siding visible at corners, under windows or behind downspouts.

04

A siding replacement or exterior renovation project.

05

Damaged or broken exterior shingles.

06

Exterior work that requires drilling or cutting through cladding.

None of these confirms asbestos. Each is a reason to have the material assessed before it is disturbed.

Local considerations

What makes this different in Chicago

Frame houses

Chicago's frame cottages and older two-flats frequently used cement shingles, and many were later covered rather than removed.

Exterior access

Scaffolding, height and weather protection add cost that interior projects do not carry.

Preservation review

Where a building is in a landmark district, exterior changes may need review in addition to the asbestos requirements.

58.1%

of Chicago housing built before 1960

38.8%

built before 1940

1953

median year structure built

43.1%

in buildings with 5+ units

Source: U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, tables B25034 and B25024. Housing age is not a measurement of asbestos prevalence.

Materials

Materials and classifications involved

Typical materials in this scope

  • Cement asbestos shingles
  • Siding fasteners and trim
  • Underlying sheathing
  • Exterior caulk and sealants

Service options compared

Options for Asbestos Siding Removal
OptionBest suited toWhat to know
RemovalSiding being replaced or damagedPermanent; exterior containment and disposal
Cover with new sidingIntact, well-adhered sidingLeaves material in place; common approach
Repair and paintMinor damageLowest cost; material remains

Who we work with

Property types

Homeowners

Older homes, basements, ceilings, siding and remodeling projects.

Landlords and property managers

Apartment buildings, two-flats and phased work around tenants.

Commercial property owners

Offices, retail, industrial and institutional buildings.

Contractors and developers

Pre-renovation inspections, demolition surveys and scheduling.

Ready to assess asbestos siding removal?

A short conversation about the material and the project is usually enough to identify the next step.

Process

The five-step professional process

  1. 01

    Inspection and material assessment

  2. 02

    Written scope and regulatory planning

  3. 03

    Containment and site preparation

  4. 04

    Professional abatement and disposal

  5. 05

    Final inspection and clearance

Read the full process guide

Expectations

What to expect and what not to expect

Expect

  • A written inspection report identifying materials by location
  • A scope that states quantities, containment and exclusions
  • Containment, negative pressure and controlled access
  • Waste manifests and disposal receipts
  • Clearance documentation before the area is returned

Do not expect

  • A diagnosis based on appearance alone
  • A firm price before the material is identified
  • Work performed without the required notifications
  • Removal of materials outside the written scope
  • A verbal clearance without documentation

Cost

Published national benchmarks

Angi

$1,218 – $3,305

Typical indoor abatement project. National average $2,261 across 3,805 verified projects.

HomeGuide

$5 – $15 / sq ft

Interior materials. Exterior materials such as roofing and siding publish at $10 – $125 per square foot.

Both publishers

$250 – $850

HomeGuide publishes $250 – $850 for inspection plus testing; a whole-home inspection alone is listed at $1,200 – $2,000+.

Angi

$150+

Disposal ($10 – $50 per cubic yard) and permit fees ($50 – $100) are commonly listed separately from removal labor.

Published benchmarks relevant to Asbestos Siding Removal
ItemPublished benchmarkPricing unit
Siding removal$7 – $10Per square foot (HomeGuide)
Siding$3 – $15Per square foot (Angi)
Whole house (2,000 sq ft)$14,000 – $20,000HomeGuide

These are published national planning benchmarks from third-party cost guides, not quotes and not this website's prices. Local Chicago pricing depends on the specific scope, access, containment requirements, disposal and notification obligations for the property.

Read the full Chicago cost guide

Pricing variables

What changes the price for this work

01

Quantity of asbestos-containing material

Square footage, linear footage and the number of separate material types drive the base price more than anything else. Two rooms of floor tile cost less than the same square footage spread across four rooms, because containment and cleaning are repeated per work area.

02

Material type and condition

Intact vinyl tile is a very different job from deteriorated pipe insulation. Crumbling, water-damaged or previously patched material requires more careful handling, more cleaning and often more air monitoring.

03

Friability and disturbance potential

Friable materials, those that can be crushed by hand, release fibers easily and demand stricter containment. Non-friable materials can become friable once they are cut, sanded or broken, which changes the scope.

04

Accessibility

A basement mechanical room with a wide stair is cheaper to work in than a crawl space, a pipe chase behind finished plaster, or a roof at a steep pitch. Access drives labor hours and equipment.

05

Containment and work-area requirements

Critical barriers, negative air machines, decontamination units, HEPA filtration and daily cleaning all scale with the size and complexity of the work area.

06

Laboratory testing and clearance

Bulk sample analysis, air monitoring, and clearance testing after the work are separate line items. Testing is what documents that the job was done correctly.

Insurance & regulations

Insurance and regulatory considerations

Insurance

Most policies treat asbestos as a pollutant and exclude planned renovation work. Removal tied to a covered loss may be treated as debris removal, depending on the policy language. Ask the insurer in writing before work begins and keep the inspection, scope, manifests and clearance report together.

Illinois and Chicago requirements

Illinois licenses asbestos contractors through IDPH, and Illinois EPA notification can apply to regulated projects. The City of Chicago requires a Notice of Asbestos Abatement at least ten working days before work that disturbs asbestos, and a Demolition Notice of Intent before non-emergency demolition.

Read the Illinois asbestos laws guide

Safety

Property-owner safety checklist

▢ Do not cut, sand, scrape or break suspect material.

▢ Keep people, pets and belongings out of the area.

▢ Do not vacuum or sweep debris from suspect material.

▢ Turn off air handling that serves the affected space.

▢ Keep documentation with the property records.

▢ Arrange an assessment before any project disturbs the material.

Questions

Asbestos Siding Removal questions

Can I pressure wash it?

No. Pressure washing can break the surface and release fibers. Gentle cleaning without abrasion is safer, and damaged areas should be assessed.

Is covering it acceptable?

Often, when the siding is intact and well adhered. The material remains on the building and must be documented for anyone who cuts into the wall later.

How is exterior work contained?

Through ground-level controls, debris netting, careful handling and controlled lowering of bagged material, along with weather planning.

Does the whole house have to be done at once?

Not necessarily. Siding projects can be phased by elevation, provided each phase is properly contained and documented.

Talk to an asbestos professional

Describe the material, the room and the building. We will explain what the assessment needs to cover and what documentation should follow.