A roof tear-off on a building constructed before the 1980s.
Service · Chicago, Illinois
Asbestos Roofing Material Removal in Chicago
Asbestos roofing removal covers roofing felt, some shingles, roof coatings and mastics that may contain asbestos, usually during a tear-off or roof replacement.
- Professional asbestos assessment
- Regulated abatement procedures
- Written project scopes
- Residential & commercial services
Asbestos roofing removal covers roofing felt, some shingles, roof coatings and mastics that may contain asbestos, usually during a tear-off or roof replacement.
Roofing is one of the more expensive abatement categories because of height, pitch, weather exposure and the volume of waste.
Warning signs
Six reasons to request an assessment
Multiple built-up layers on a flat roof.
Roofing felt or underlayment of unknown composition.
Flashing cement and roof coatings from an older installation.
A roof replacement being planned without a materials assessment.
Storm damage requiring removal of roofing materials.
None of these confirms asbestos. Each is a reason to have the material assessed before it is disturbed.
Local considerations
What makes this different in Chicago
Flat roofs
Chicago's flat roofs on commercial and multifamily buildings often have several built-up layers, each of which may be a different material.
Weather window
Exterior abatement is weather-dependent, which compresses the usable schedule and can add cost.
Waste volume
Roofing waste is heavy and bulky, and disposal is priced by volume or weight.
58.1%
of Chicago housing built before 1960
38.8%
built before 1940
1953
median year structure built
43.1%
in buildings with 5+ units
Source: U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates, tables B25034 and B25024. Housing age is not a measurement of asbestos prevalence.
Guidance
Federal and state guidance that applies
Materials
Materials and classifications involved
Typical materials in this scope
- Roofing felt
- Asphalt shingles
- Roof coatings
- Flashing cement
- Built-up roof layers
Service options compared
| Option | Best suited to | What to know |
|---|---|---|
| Full tear-off | Roof being replaced | Permanent; exterior containment and disposal |
| Re-cover | Sound deck and code-compliant assembly | Leaves material in place; must be documented |
| Targeted repair | Localized damage | Smallest scope; leaves most material in place |
Related services
Services that often go together
Asbestos Siding Removal
Cement asbestos siding removed from bungalows and older frame buildings without breaking the material.
Explore service →Commercial Asbestos Abatement
Scheduled abatement for offices, retail, industrial and institutional buildings with documented closeout.
Explore service →See all 12 services on the services overview.
Who we work with
Property types
Homeowners
Older homes, basements, ceilings, siding and remodeling projects.
Landlords and property managers
Apartment buildings, two-flats and phased work around tenants.
Commercial property owners
Offices, retail, industrial and institutional buildings.
Contractors and developers
Pre-renovation inspections, demolition surveys and scheduling.
Ready to assess asbestos roofing material removal?
A short conversation about the material and the project is usually enough to identify the next step.
Process
The five-step professional process
- 01
Inspection and material assessment
- 02
Written scope and regulatory planning
- 03
Containment and site preparation
- 04
Professional abatement and disposal
- 05
Final inspection and clearance
Expectations
What to expect and what not to expect
Expect
- A written inspection report identifying materials by location
- A scope that states quantities, containment and exclusions
- Containment, negative pressure and controlled access
- Waste manifests and disposal receipts
- Clearance documentation before the area is returned
Do not expect
- A diagnosis based on appearance alone
- A firm price before the material is identified
- Work performed without the required notifications
- Removal of materials outside the written scope
- A verbal clearance without documentation
Cost
Published national benchmarks
Angi
$1,218 – $3,305
Typical indoor abatement project. National average $2,261 across 3,805 verified projects.
HomeGuide
$5 – $15 / sq ft
Interior materials. Exterior materials such as roofing and siding publish at $10 – $125 per square foot.
Both publishers
$250 – $850
HomeGuide publishes $250 – $850 for inspection plus testing; a whole-home inspection alone is listed at $1,200 – $2,000+.
Angi
$150+
Disposal ($10 – $50 per cubic yard) and permit fees ($50 – $100) are commonly listed separately from removal labor.
| Item | Published benchmark | Pricing unit |
|---|---|---|
| Roof removal | $40 – $125 | Per square foot (HomeGuide) |
| Roof and shingles | $50 – $120 | Per square foot (Angi) |
| Roof replacement | Separate cost | Quoted by the roofer |
These are published national planning benchmarks from third-party cost guides, not quotes and not this website's prices. Local Chicago pricing depends on the specific scope, access, containment requirements, disposal and notification obligations for the property.
Pricing variables
What changes the price for this work
Quantity of asbestos-containing material
Square footage, linear footage and the number of separate material types drive the base price more than anything else. Two rooms of floor tile cost less than the same square footage spread across four rooms, because containment and cleaning are repeated per work area.
Material type and condition
Intact vinyl tile is a very different job from deteriorated pipe insulation. Crumbling, water-damaged or previously patched material requires more careful handling, more cleaning and often more air monitoring.
Friability and disturbance potential
Friable materials, those that can be crushed by hand, release fibers easily and demand stricter containment. Non-friable materials can become friable once they are cut, sanded or broken, which changes the scope.
Accessibility
A basement mechanical room with a wide stair is cheaper to work in than a crawl space, a pipe chase behind finished plaster, or a roof at a steep pitch. Access drives labor hours and equipment.
Containment and work-area requirements
Critical barriers, negative air machines, decontamination units, HEPA filtration and daily cleaning all scale with the size and complexity of the work area.
Laboratory testing and clearance
Bulk sample analysis, air monitoring, and clearance testing after the work are separate line items. Testing is what documents that the job was done correctly.
Insurance & regulations
Insurance and regulatory considerations
Insurance
Most policies treat asbestos as a pollutant and exclude planned renovation work. Removal tied to a covered loss may be treated as debris removal, depending on the policy language. Ask the insurer in writing before work begins and keep the inspection, scope, manifests and clearance report together.
Illinois and Chicago requirements
Illinois licenses asbestos contractors through IDPH, and Illinois EPA notification can apply to regulated projects. The City of Chicago requires a Notice of Asbestos Abatement at least ten working days before work that disturbs asbestos, and a Demolition Notice of Intent before non-emergency demolition.
Safety
Property-owner safety checklist
▢ Do not cut, sand, scrape or break suspect material.
▢ Keep people, pets and belongings out of the area.
▢ Do not vacuum or sweep debris from suspect material.
▢ Turn off air handling that serves the affected space.
▢ Keep documentation with the property records.
▢ Arrange an assessment before any project disturbs the material.
Service areas
Where this service is offered
Questions
Asbestos Roofing Material Removal questions
Are all old shingles asbestos?
Can the roof be re-covered?
How is exterior abatement contained?
Does the roof have to be done before replacement?
Talk to an asbestos professional
Describe the material, the room and the building. We will explain what the assessment needs to cover and what documentation should follow.
